Questions, answered.
01How long does an epoxy floor take to install?+
Most residential garages take two to three days from grind to final topcoat. Commercial jobs run from a single day for line marking up through a week or more for large warehouse grind-and-seal work. We confirm a schedule before we start so you know exactly when you can use the floor.
02Do I need to move everything out of the garage?+
Yes — the slab needs to be completely clear so we can grind, prep, and coat without contamination. We'll talk you through what's needed before the start date.
03Is the floor hot-tyre resistant?+
Our flake and polyaspartic-topcoated garage systems are hot-tyre rated. Cheaper one-pack DIY kits typically aren't — that's where most peel-up failures come from.
04Can you match an existing colour or RAL code?+
Yes. Solid colour epoxies can be tinted to standard greys, RAL codes, or matched from a sample.
05Do you offer a warranty?+
All of our installations are backed by a 10-year warranty.
06What areas do you cover?+
We're based in the South-East and work across Berwick, Clyde, Narre Warren, Pakenham, and surrounds. Commercial and industrial work covers the wider South-East Melbourne region.
07What's the cost?+
Pricing depends on the system, the condition of the existing slab, and the area. Send us the room dimensions and a few photos through the quote form and we'll come back with a fixed price.
